Skip to content
The Fungus & Mungus Railroad

Building Yesterday, Today

  • Home
  • On the Workbench
  • Life Along the Fungus & Mungus
  • Posts Archive
  • Photo Gallery
  • About Us

Posts by Steven Folino

Home » Archives for Steven Folino » Page 3
About Steven Folino

Starting Over from Scratch

Posts pagination

Previous page 1 2 3

Recent Posts

  • Under ConstructionMay 19, 2026
    Several new structures have been crafted and are ready to be placed on the layout.
  • New AdditionMay 6, 2026
    Join us in welcoming the newest addition to the Fungus & Mungus Railroad. Spicy the Bold, pictured, has completed her 6-month probationary period and is now a full-time member of the staff. Six months ago, she showed up at the FMRR office looking for work. She has been assigned to the personnel department, where her duties will include making rounds of the other staff members to ensure they are wide awake and fully engaged in their assigned tasks. No sleeping on the job while she is on duty. Each of our executive staff members has distinct responsibilities. Lavender the Clueless…
  • We Did ItMarch 24, 2026
    We did it! Yesterday, we reached another milestone in the construction of the Fungus & Mungus HO Scale model railroad. The last of the mountains, hills, and valleys have been constructed and had their base coats of paint applied. We now switch from construction/building to the artistic part of layout building. So, here’s where we stand: The layout is 100% operational, but barren… devoid of the details that will bring it to life. Up till now, it’s all been carpentry, electrical, electronics, sculpting, and painting. All of it is craftsman-type work. With the start of Phase Five, it becomes artistic.…
  • Safety FirstJanuary 30, 2026
    It’s time for the annual tunnel inspection. We’re required to inspect the openings, portals, and bracing for all of the tunnels along the Fungus and Mungus Railroad right-of-way. Shown here is Grigio the Gray, Director of Quality Control, inspecting tunnel portal #5 at the south end of the FMRR mainline. According to Director Gray, everything is in order and in tip-top shape.
  • A Night Watchman’s TaleDecember 24, 2025
    Twas the night before Christmas and across the pike Not a locomotive was running not even the ol’ Mike. Their fireboxes cold, their ashes all dumped; There was nary a car in the yard to be humped. The railyard was quiet, nary a sound could be heard; In the dark of the night nothing did stir. A flurry of snow is expected tonight; I’d better hurry, the old pot belly to light. As the moon rose so high in the sky that night I knew that everything would soon be alright. I had just settled into the old watchman’s chair;…
Copyright 2026 — The Fungus & Mungus Railroad. All rights reserved. Sinatra WordPress Theme
Scroll to Top