Safety First

It’s time for the annual tunnel inspection. We’re required to inspect the openings, portals, and bracing for all of the tunnels along the Fungus and Mungus Railroad right-of-way. Shown here is Grigio the Gray, Director of Quality Control, inspecting tunnel portal #5 at the south end of the FMRR mainline. According to Director Gray, everything is in order and in tip-top shape.